waterproofing at openings
This study started by analyzing the time implications and potential conflicts associated with the current waterproofing system implemented in the factory. The primary objective was to evaluate the hypothesis that adding a backdam to the existing robust waterproofing standard would be both cost-effective and time-efficient.
The collaborative effort among manufacturing, design, waterproofing product expert, and client representatives resulted in the development of a comprehensive set of work instructions and procedures that remain the factory's standard to this day.